● Factory Lingen (Ems) · Made in Germany Since 1969
Home Machines Applications Rental Company Contact Request a quote
DE EN
Phone · +49 (0) 591 76 314
Email · info@lingener-baumaschinen.de
Projects worldwide

What LIBA
has delivered.

Selected reference projects — from fibre optic backbone routes to mining operations in hard rock. Every project, every machine, every metre counts.

Fibre optic backbone Bavaria 01 — Germany · 2023
01 / Telecommunications

Fibre Optic Backbone
Bavaria

Installation of a fibre-optic backbone ring for a district council in Upper Bavaria. Sandy loam with gravel inclusions, densely built-up surroundings.

MachineGM 4 Crawler
Route length42 km
Duration9 weeks
GroundSandy loam, gravel
Cut width100 mm
Daily outputavg. 820 m

Gas pipeline Lower Saxony 02 — Germany · 2022
02 / Utilities

Gas Pipeline
Lower Saxony

Trench for a low-pressure gas pipeline DN 300 through peat bogs and compact clay. Demanding ground geometry, tight cutting depth specification.

MachineGM 180 AF
Pipe dimensionDN 300
Cutting depth1,200 mm
Route length8.4 km
GroundAlluvial clay, peat
Carrier power220 kW

Solar park Brandenburg 03 — Germany · 2023
03 / Energy

Solar Park
Brandenburg

Earth cable installation for a solar park covering 42 ha. Sandy ground, high area output required — minimal surface damage for subsequent planting.

MachineGM 4 All-Wheel
Cable trenchapprox. 85 km
Area42 ha
GroundSand, light loam
Daily outputavg. 960 m
Duration12 weeks

Sports field drainage Hamburg 04 — Germany · 2022
04 / Sports & Drainage

Sports Field Renovation
Hamburg

Drainage renovation of a club sports field with natural turf. Tight time constraints due to ongoing fixtures, minimal turf damage an absolute requirement.

MachineGM 4 All-Wheel
Drainage trench11 km
Area2.4 ha
GroundTurf / loam
Cut width80 mm
Duration3 days

Mining development Austria 05 — Austria · 2021
05 / Mining & Rock

Mining Development
Tyrol

Installation of a supply line in a mining area — limestone up to rock class IV. Excavators and cut-off saws were not economically viable.

MachineGM 6 ASR
Route length3.2 km
Cutting depth800 mm
GroundLimestone class IV
Daily outputavg. 95 m
ToolingTungsten carbide picks
Your Project

Similar project?
Let's talk.

Send us soil reports, route plans or simply a project description — we'll recommend the machine and tooling configuration for your ground conditions.

Sales direct from the factory
+49 (0) 591 76 314
Email
info@lingener-baumaschinen.de